Site 001

Finding Settlement Zero

No location has been selected. That is intentional. Site 001 will be chosen with a repeatable process rather than attachment to a particular parcel.

Nothing on this page describes a selected site, an owned parcel or a confirmed region.

The approach

Not the cheapest acreage. The right place for the whole model.

The goal is a jurisdiction and parcel where the complete model can be permitted, supplied with secure water, built at reasonable cost, occupied legally and replicated.

  1. 1. Country

    Can a cooperative own land and run the model here?

  2. 2. Region

    Are climate, water law, building rules and land prices promising?

  3. 3. Jurisdiction

    Can clustered homes, shared facilities and agriculture be approved?

  4. 4. Parcel

    Does this land have water, access, buildable ground and clean title?

Hard gates

One red gate stops a purchase

"Unknown" is not the same as "pass". A parcel that fails any gate is rejected, whatever its price or beauty.

Site 001 hard gates
GateTo pass
Legal ownershipThe entity can control the land and the intended occupancy structure is possible.
Legal accessRecorded, practical, year-round access plus an emergency route.
Potable waterA defensible source and quantity for a phased population, with feasible treatment.
WastewaterA permittable treatment and disposal concept at the planned population.
Residential densityA credible path for clustered small homes and occupancy rights.
Common usesA viable path for the community building, workshops, food systems and agriculture.
HazardsBuildable high ground outside unacceptable flood, wildfire or geotechnical risk.
TitleClean title, with easements and mineral and water rights understood.
EconomicsLand plus mandatory infrastructure stays within the capital envelope.
Community viabilityReasonable access to emergency care, supplies, workforce and transport.

The scorecard

A 100-point index, weighted toward water

Sites that pass every gate are scored from 0 to 5 in ten categories, weighted and normalised to 100.

Site Index weights
CategoryWeightWhat is measured
Water security20Source, aquifer resilience, quality, legal rights, redundancy and cost
Regulatory feasibility15Density, clustered housing, common facilities, agriculture and alternative construction
Land affordability15Purchase and transaction costs against usable acreage
Rainfall and catchment10Precipitation, catchment, storage potential and lawful harvesting
Climate and hazards10Heat, cold, wildfire, flood, wind and drought
Alternative building10Small structures, engineered domes and owner-builder pathways
Agriculture and soils5Soil, growing season and greenhouse viability
Renewable energy5Solar resource, microgrid and grid options
Access and services5Roads, freight, medical care, trades and communications
Stability5Property rights, predictable administration and institutional stability

Water first

Slow it. Spread it. Sink it. Store it.

Hydrology is mapped before any road, building or ring is drawn.

  • Map ridgelines, catchments, washes, floodways and safe high ground first
  • Estimate rainfall by month, including drought years and extreme storms
  • Inventory wells, yields, water quality and legal pumping limits
  • Calculate demand for 20, 50 and 100 residents plus agriculture
  • Keep potable, domestic, agricultural and landscape water budgets separate
  • Always keep safe overflow routes: the settlement must never become the dam

Current research

Where the research has looked so far

Research to date has focused on southeastern Arizona (the Cochise County area) and southwestern New Mexico: large rural parcels, strong solar resource and high-desert land. Other U.S. and international regions stay on a research list, not a ranking.

Southeastern Arizona grassland with a saguaro and a mountain range.
Southeastern Arizona: a research area, not a selected site.

From screen to decision

How a parcel would be tested

  1. Screen

    Desktop gates and score

    Hard gates and the Site Index, before anyone visits.

  2. Check

    Planning pre-check

    A written or phone check with the local planning authority.

  3. Visit

    Site visit

    Water, access, hazards and topography observed on the ground.

  4. Control

    Conditional control

    An option or due-diligence period rather than an unconditional purchase.

  5. Diligence

    Professional diligence

    Survey, title, water, wastewater, geotechnical, environmental and planning.

  6. Decide

    Documented go or no-go

    Measured against the gates and score, with real infrastructure costs in the model.

Kill criteria

Willing to walk away from a beautiful property

  • No defensible potable-water solution
  • No credible legal path to the intended population
  • Wastewater that is impossible or disproportionately expensive
  • Floodway or geotechnical conditions that consume the usable site
  • Infrastructure that pushes costs well beyond the affordability thesis
  • An approval path that depends on ignoring enforcement
  • Approval that requires removing work-to-own access or shared infrastructure

Follow the search

Hear when Site 001 research advances

Founding Circle members receive research updates first, and people who know land, water or planning can help directly.